R302
Price: US$5.3-22.2
MOQ: 200m
Code: R302
- Dimensions
- Overtravel at 100 mm/s and 400 N*:
Description
Safety contact edge for lifting platform R302 is the middle size, it’s hot product and used widely. This rubber profile works with Safety sensor tape FS-3.
The advantage of this Safety contact edge:
1. The bottom design is easy to install on the aluminum track.
2. It is long service life for the outer rubber profile.
Technical Data
1. Product Name |
safety contact edge for lifting platform |
2. Item |
R302 + FS-3 |
3. Material |
EPDM and silicone |
4. Color |
black or customized |
5. Dimension |
25mm*36mm |
6. Custom Design |
OEM&ODM |
7. Service life |
>100,000 times or 20 years |
8. Required force |
29N |
9. Sample Lead Time |
3-10 Days |
10. Production Time |
10-30 Days |
11. Weight |
±420 g/m |
12. Packing |
50m/roll |
Application
Safety contact edge R302 is for lifting platform, auto gates, industrial doors and machines.
Warranty Term
We offer two years warranty for our safety edge
Warranty since from the shipping date or invoice date
Within the warranty period, we will call back the faulty product for analyzing and confirm
it is the products itself quality problem, we would compensate the new ones free of
charge and delivery with the next order by sea.
No warranty:
a) Damage caused by man-made or misuse
b) parts subject to wear and tear
c) consumables such as bulbs, batteries and fuses.
Packing & Shipping
50 meters per roll, 1roll into one carton;
By express, By sea.
Our Service
1. Service life: >100,000 times or 20 years
2. Professional online within 24 hours and after-sales service
3. Delivery method: Express, Shipping, Airlines
4. One-Stop Solution
5. Sample available
FAQ
1. What is the trade terms?
FOB, CIF, EXW, Etc.
2. What are the payment terms?
T/T, L/C, Western Union, Paypal.
3. Do you have the matched accessories?
Yes. We offer One-Stop Solution service and supply the related accessories.
4. What is the delivery port?
Ningbo or Shanghai
5. MOQ and production time?
MOQ 200 meters and about 20 days lead time.